Fotografie als passie

Silver wing

Liège-Guillemins railway station...
The new station by the architect Santiago Calatrava was officially opened on 18 September 2009. It has 9 tracks and 5 platforms. All the tracks around the station have been modernised to allow high speed arrival and departure.

The new station is made of steel, glass and white concrete. It includes a monumental arch, 160 metres long and 32 metres high.

avatar

Gilbert Claes

Bekijk profiel

Foto Informatie

Categorie(ën) : Architectuur

Geniet je van dit artikel?

Deel het met de wereld

Ad Path: /1007006/dev_digiphotopro_gallery_read